To ensure the construction precision and structure safety of the Wenhui Bridge, engineers built a construction control measure network and adopted total stations to monitor cable tower offsets.
为确保文辉大桥的施工精度和结构安全,建立了施工控制测量网,采用全站仪对索塔位移进行了监测。
This paper analyse the influences of precision of bridge, measuring jig and so on to measuring accuracy, and discusses the improvements.
本文分析了电桥的精度、测量夹具等因素对测量结果准确性的影响,并提出了具体改进措施。
Practice results proved that the closure precision and the alignment of bridge after being folded reached the demands of the construction criterion.
实践证明,龙华松花江特大桥成桥后的线形和合拢精度均达到施工规范的要求。
应用推荐